This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 22, 2024
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: April 11, 2024
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: April 2, 2024
DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...Last updated: February 16, 2024
CSBP Limited proposes to construct and operate a new ammonia plant within the CSBP Kwinana Industrial Complex in the Kwinana Industrial Area (KIA), located approximately 40 km south of the Perth Central Business District. The proposal will use natural gas sourced from the Dampier to Bunbury Natural Gas Pipeline (DBNGP), integrated with hydrogen production from a 10 megawatt electrolyser manufacture ammonia, which will then be used by CSBP for the manufacture of other chemical products or sold... Read more...Last updated: February 13, 2024
Chichester Metals Pty Ltd, a subsidiary of Fortescue Metals Group, proposes to develop and operate an iron ore mine approximately 80 kilometres north-west of Newman. The Nyidinghu Iron Ore Mine proposal includes mine pits above and below the water table, an on-site ore processing from various sources, waste rock and tailings storage, an aerodrome, groundwater abstraction, surplus water management including aquifer recharge and other supporting infrastructure. The proposal has a development... Read more...Last updated: April 8, 2024
The Proposal is for the construction and operation of a Renewable fuels processing facility that produces renewable diesel and sustainable aviation fuel from vegetable oils, animal fats and other biowaste products. The biorefinery will reuse the existing processing infrastructure formerly used for hydrocarbon refining (such as hydrofiner units, storage tanks, pipelines and utilities such as the flare and wastewater treatment plant) combined with some additional new infrastructure such as a... Read more...Last updated: November 27, 2023
Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...Last updated: October 2, 2023
Bulletin Resources Limited are proposing a mineral exploration programme on exploration licence 74/655 within the Shire of Ravensthorpe. The proposal is within the Cocanarup Timber Reserve located to the west of the Ravensthorpe townsite. The proposal would include a total disturbance footprint of of 7 hectares for tracks and drill pads developed in two stages. Read more...Last updated: May 29, 2023
FutureEnergy Australia is proposing to construct and operate a biorefinery processing plant to produce a renewable biodiesel. The proposed proposal is located on Lot 31 on Plan 404104, Narrogin, within the shire of Narrogin, Western Australia. The proposal includes a biorefinery plant, a feedstock receival area, woodchip drying beds, and supporting infrastructures. The biorefinery plant will utilize waste lignocellulose biomass as feedstock which will undergo pyrolysis followed by non-catalytic... Read more...Last updated: February 20, 2023
Project Haber Pty Ltd proposes to construct and operate a 1.4 million tonnes per annum (Mtpa) urea plant in East Arrowsmith (South Erregulla). The proposal is located approximately 280 km north of Perth and 45 km south east of Dongara, in the Shire of Three Springs. The urea plant comprises of an Air Separation Unit (ASU) producing nitrogen, oxygen and hydrogen for various processes; an ammonia synthesis unit; and a granulation and urea production unit. Supporting infrastructure includes gas... Read more...Last updated: December 19, 2022
Wasterock Pty Ltd and Hazelland Pty Ltd propose to remediate a historical inert landfill located at Lot 20 Adelaide Street Hazelmere for future commercial use. The proposal would involve recontouring the existing site and capping it with clean fill. Read more...Last updated: August 23, 2022
Australian Gold Reagents Pty Ltd propose to increase production at the existing Kwinana sodium cyanide liquid plant from 91,000 tonnes per annum (tpa) to a total of 110,000 tpa; and to increase production of solid sodium cyanide from 45,000 tpa up to 60,000 tpa. The proposal also includes connecting the two existing thermal combustion units to allow waste gas from either plant during down time to be directed through a combined header to the operational thermal combustion unit for effective... Read more...Last updated: August 4, 2022
Yara Pilbara Fertilisers Pty Ltd propose to modify the existing Pilbara Fertiliser project to include the development of a Renewable Hydrogen Plant and associated infrastructure. The proposal is located approximately 11 km north-west of Karratha in the Pilbara region of Western Australia. The proposal is adjacent to the National Heritage listed area and the Murujuga National Park. The proposal would include a total disturbance of 24.78 hectares. The proposal will result in reduction of... Read more...Last updated: June 7, 2022
DevelopmentWA proposes to subdivide Lot 40 (No. 217) Devlin Road, Wellesley (Shire of Harvey) into approximately 34 lots to facilitate future industrial development. Areas of the Marriott Road reserve (Lots 41 & 42) are also proposed to be cleared to facilitate the safe movement of vehicles to and from the site and for upgrading of electrical services. The proposal would include a total development envelope of 119 hectares, including proposed clearing of up to 27.1 hectares of native... Read more...Last updated: April 11, 2022
Change existing Condition 7 of Ministerial Statement 586 so that it is adequate with respect to avoiding, reducing, and offsetting greenhouse gas emissions. Read more...Last updated: March 15, 2022
The requested change relates to changing condition 9 in order to contemporise the condition with the Environmental Factor Guideline – Greenhouse Gas (GHG) Emissions (EPA 2020) Read more...Last updated: March 14, 2022
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: January 25, 2022
Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...Last updated: January 24, 2022
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...