This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 30, 2004
The City of Wanneroo intends to construct an extension of Hepburn Avenue between Mirrabooka Avenue and The Avenue, in Landsdale. The major components of project include the: relocation of flora and fauna; collection of seeds; clearing of vegetation; mulching; stripping and stockpiling of topsoil; earthworks, including disposal of surplus spoil; re-spreading of topsoil; spreading of mulch; construction of the road; and management of adjacent land for conservation. Read more...Last updated: November 17, 2004
The Environmental Protection Authority (EPA) has been required by the Minister for the Environment to provide further assessment on the proposal by James Point Pty Ltd (JPPL) to construct and operate a private container and general cargo Port (referred to as the Stage 1 Port) to the north of James Point in Cockburn Sound. See the original assessment here . Read more...Last updated: November 14, 2004
The proposal is to construct and operate Stage 1 of a container and general cargo port, consisting of dredged channels, turning basin and berthing pocket, a cargo wharf on reclaimed land, an off-shore breakwater and associated cargo handling facilities, to the north of James Point in Cockburn Sound. The land area to be developed is located in the Kwinana Industrial Area within the Town of Kwinana. It is envisaged that the port will handle a range of cargoes, notably livestock, though other... Read more...Last updated: September 29, 2004
The proposal involves the construction, deepening and extension of shipping channels, a swing basin and berth pockets for the passage and docking of ships by dredging of approximately 3.1 million cubic metres of earth and rock material from the sea bottom. The dredge materials will be disposed of to designated sites on land and on the ocean floor. Read more...Last updated: July 9, 2004
Water Corporation proposes to upgrade the capacity of the Perth Metropolitan Desalination Proposal from the originally approved 30 GL per year to 45 GL per year for the Kwinana Power Station (KPS) site only. The proposed changes include increasing the use of seawater (from 220ML per day average to 300ML per day average), production of potable water (from greater than 100ML per day to greater than 150ML per day) and discharge of concentrated seawater (from 120ML to 180ML per day (weekly average... Read more...Last updated: July 8, 2004
The proposal is to construct an international standard motorsports complex in Picton, near Bunbury. This comprises a racing circuit, pit area, rally and off-road testing facility, grandstand, control centre, and associated roads and car parks. It is intended that accommodation and a racing technology park will be constructed at a later date. However, these will be subject to separate assessment, as will the use of the complex for other purposes, such as concerts. Read more...Last updated: June 25, 2004
Proposal by the Water Corporation to construct a Water Treatment Plant in Mundaring and Water Storage Tanks in Sawyers Valley. Read more...Last updated: May 27, 2004
Inquiry under section 46 of the, Environmental Protection Act 1986, to the Telfer Project power suppy and infrastruction corridor.The recommended change to the environmental conditions of Ministerial Statement 605 will reduce the length of open trench permitted for the approved project from 60 km to 20 km and accordingly reduce the level of fauna mortality experienced during the construction of the pipeline. Read more...