Project Proponent Hamersley Iron Pty Limited Proposal description The proponent (Hamersley Iron Pty Limited) proposes to build and develop a desalination plant at Parker Point, Dampier, located approximately 2.5km north-east of the Dampier township. This Proposal will establish a reliable potable water supply for the Proponent’s Dampier port operation (including Parker Point and East Intercourse Island), Dampier town and connection into Water Corporation’s West Pilbara Water Supply Scheme (WPWSS). The desalination plant may be delivered in stages up to a maximum production capacity of 8 GL/a of potable water to meet future water demands. The Proposal would include: Seawater desalination plant Seawater intake Outfall to ocean Water transfer pipelines connecting the plant to potable water tanks and the existing West Pilbara Water Supply Scheme Other associated supporting infrastructure and services The proposal development envelope is 57.5 ha with most works occurring on previously disturbed land. 0.9 ha of the development envelope will occur within the Dampier Archipelago (including Burrup Peninsula) National Heritage Place (NHP) (0.002%). This intersect of the NHP occurs within the existing disturbed corridor that contains Water Corporation transfer pipelines. 13.5 ha of native vegetation will be cleared in the envelope (and 0.3 ha of this vegetation is within the NHP). The life of the proposal is projected to be 50 years. Region Pilbara Referred under EP Act s38 Industry sector Infrastructure Last updated April 11, 2023 Current Status Decision on whether to assess has been published 1. Referral Comment on this referral Dampier Seawater Desalination Plant (DSDP) Referral documentation Referral form (PDF, 342.73 KB) Supporting document (PDF, 39.61 MB) Appendix A - DSDP OEMP_Rev0.pdf (PDF, 3.3 MB) Appendix B - DSDP_CEMP_Rev0.pdf (PDF, 2.7 MB) Appendix D - Memo_Engineering Design Detail.pdf (PDF, 4.16 MB) Appendix F - Dilution Modelling Report_Rev 0.pdf (PDF, 7.64 MB) Appendix G - Parker Point Power Station Pond Sediment Study.pdf (PDF, 2.16 MB) Appendix H - Benthic Habitat Survey January 2021.pdf (PDF, 1.31 MB) Appendix I - Parker Point Marine Assessment of Impacts.pdf (PDF, 4.16 MB) Appendix J - Environmental Noise Impact Assessment.pdf (PDF, 3.81 MB) Appendix K -JASCO Pile Drilling Technical Memo.pdf (PDF, 279.64 KB) Appendix L -DSDP Flora_Veg_Fauna Report.pdf (PDF, 56.5 MB) 2. Decision on whether to assess this proposal Chair's Determination Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. No advice given (Appealable) Extract of determination Dampier Seawater Desalination Plant (PDF, 291.63 KB) Preliminary Environmental Factors Social Surroundings Marine Environmental Quality Date published Tuesday, 11 April, 2023