Project Proponent Worsley Alumina Pty Ltd Proposal description Worsley Alumina’s alumina refinery has existing approval for the production of 3.7 million tonnes per anum (Mtpa) of alumina. This proposal is for the construction and operation of a natural gas-fired, co-generation option. The proposal would be implemented in two stages, each consisting of a gas turbine with a nominal generation capacity of 120 MW electrical output and a heat recovery steam generator (HRSG) of nominally 210 MW steam output. The facility would be located at the Worsley alumina refinery. Each of the stages could provide approximately 994 gigawatt hours (GWhr) of electricity annually, much of which would be exported into the South West Interconnected System (SWIS). Note: There is a separate proposal for expansion of the project to increase production to 4.4 Mtpa. The proposal details an option of coal fired co-generation. Assessment Number 1584 Region South West Referred under EP Act s38 Industry sector Power generation Last updated October 19, 2005 Current Status Ministerial Statement published 2. Decision on whether to assess this proposal Chair's Determination Assessment on referral information (ARI) Date published Monday, 8 August, 2005 4. EPA Report on assessment EPA Report Number 1189 EPA Report Gas Fired Co-generation Facility (PDF, 4.18 MB) Date published Monday, 8 August, 2005 Appeals close Monday, 22 August, 2005 5. Decision on proposal and implementation of proposal Ministerial Statement Date of approval Wednesday, 19 October, 2005 Ministerial Statement Ministerial Statement 694 (PDF, 929.71 KB)