Gold Mine Developments on Lake Lefroy [1809]

Project
Proposal description

The proposal is to expand existing open-cut and underground gold mining developments within a defined project area on the surface of Lake Lefroy, approximately 20 kilometres south east of Kambalda. The proposal includes the discharge of dewatering to the lake’s surface and the construction of associated mining infrastructure (including open pits and waste rock dumps).

Assessment Number
1809
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
Scoping
Approved
Environmental Review
Proponent response to submissions
4. EPA Report on assessment
EPA Report Number
1411
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 879 – Increase of 348 hectares to the area of disturbance – change to proposal approved under section 45C on 26 March 2014.

Attachment 2 to Statement 879 – Increase the boundary of approved Development Envelope; re-align layout of the approved area of disturbance; additional dewatering discharge points; and remove elements of the key characteristics table that are not relevant to the environment or regulated under other legislation - change to proposal approved under section 45C on 30 December 2016.

Date of approval s. 45C
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email