Project Proponent Talison Lithium Australia Pty Ltd Proposal description Talison Lithium Australia Pty Ltd (Talison) propose to expand the existing Greenbushes Lithium Mine that has been operating for over 30 years, to increase the production of spodumene ore and lithium mineral concentrate from the operation. This proposal is an expansion of the existing mining operation to incorporate: Construction of the S2 waste rock landform (WRL) as an expansion of the Floyds WRL. Construction and operation of the S8 WRL to the east of the existing proposal development envelope. Expansion of existing agricultural dams to create a larger Salt Water Gully Dam (SWG Dam) located within Salt Water Gully northeast of the existing proposal development envelope. Development of new Floyds Water Management Infrastructure to stop discharge of water-borne leachates from waste rock on the eastern side of the proposal. Extension of the Maranup Ford Road Infrastructure Corridor. Additional Chemical Grade Plant 4 (CGP4) laydown areas. Raising of the Austins and Southampton Dam embankments. Realignment of Spring Gully Road Development of laydowns and / or stockpiles in areas adjacent to Austins and Southampton Dams. The mine is located in the South West region of Western Australia, immediately south of the town of Greenbushes, approximately 250 km south east of Perth, Western Australia. The proposal development envelope would increase from the 2,207 ha authorised under Ministerial Statement 1111 (MS 1111) to 2,826 ha (619 ha, 28% increase). The proposal requires additional clearing of 191 ha within the proposal development envelope to a total of 541 ha. The proposal would result in the direct loss of 350 ha native vegetation (approved under MS 1111), additional 162 ha of native vegetation (State Forest 20) and 29 ha of mine disturbance rehabilitation. Proposal Content Document Proposal Content Document - December 2025.pdf (PDF, 4.62 MB) Assessment Number 2496 Region South West Referred under EP Act s38 Industry sector Lithium Last updated December 16, 2025 1. Referral Comment on this referral Greenbushes Lithium Mine: Waste Rock Landforms, Salt Water Gully Dam and additi… Referral documentation Referral form (PDF, 478.04 KB) Supporting Document (PDF, 9.06 MB) Appendix A - Proposal Content Document.pdf (PDF, 105.78 KB) Appendix AA - Eastern Catchments - Groundwater Modelling (PDF, 15.17 MB) Appendix AA - Eastern Catchments Hydology Study - Monitoring Plan (PDF, 4.69 MB) Appendix AA - Eastern Catchments Study - Conceptual Model (PDF, 9.7 MB) Appendix AA - Eastern Catchments Study - Risk Assessment (PDF, 8.87 MB) Appendix AA - Eastern Catchments Study - Water Balance Modelling (PDF, 11.86 MB) Appendix AA - Interim SWG Dam Water Balance Results (PDF, 2.81 MB) Appendix AA - Surface Water - Site Wide_GHD-2019 (PDF, 14.66 MB) Appendix AB - Eastern Catchments - S2 S7 Groundwater Modelling (PDF, 14.56 MB) Appendix AB - Eastern Catchments - S2 S7 Risk Assessment (PDF, 2.87 MB) Appendix AB - Eastern Catchments Hydrology Study S2 & S7 – Monitoring Plan (PDF, 2.23 MB) Appendix AB - Eastern Catchments Study - Surface Water Balance Modelling - S2 and S7 (PDF, 13.68 MB) Appendix AB - Eastern Catchments Study S2 & S7- Conceptual Model (PDF, 2 MB) Appendix AC - Herring Storer Acoustics 2023 Greenbushes Expansion Acoustic Assessment (PDF, 8.33 MB) Appendix AC - Herring Storer Acoustics 2025a Greenbushes Expansion S2 Acoustic Assessment (PDF, 6.27 MB) Appendix AC - Herring Storer Acoustics 2025b Greenbushes Expansion S8 Acoustic Assessment (PDF, 5.82 MB) Appendix AD - Talis Visual Impact Assessment.pdf (PDF, 49.27 MB) Appendix AE - Air Quality Assessment_ETA 2023 (PDF, 10.5 MB) Appendix AF - S2_WRL_Air_Quality_Assessment.pdf (PDF, 18.54 MB) Appendix AG - Dust Impact Assessment_GHD 2019 (PDF, 2.71 MB) Appendix AH - Greenbushes Expansion Project GHG MP.pdf (PDF, 1.02 MB) Appendix B - 2024 Compliance Assessment Report.docx (PDF, 3.77 MB) Appendix C - Stakeholder Register.pdf (PDF, 90.38 KB) Appendix D - Onshore SWG Combined and Extended Flora and Veg.pdf (PDF, 5.81 MB) Appendix E - Onshore SWG Downstream Flora and Veg.pdf (PDF, 3.03 MB) Appendix F - Onshore S2S7 Future WRL Flora and Veg.pdf (PDF, 4.6 MB) Appendix G - Onshore Additional Areas North Flora & Veg.pdf (PDF, 11.78 MB) Appendix H - Onshore GDV Report.pdf (PDF, 3.45 MB) Appendix I - Onshore Upcoming Clearing Flora and Veg.pdf (PDF, 4.81 MB) Appendix J - Glevan SWG Dieback Occurrence Report.pdf (PDF, 1.89 MB) Appendix K - Onshore SWG Combined and Extended Fauna.pdf (PDF, 5.68 MB) Appendix L - Onshore S2S7 Fauna.pdf (PDF, 4.13 MB) Appendix M - SLR Aquatic Fauna Survey 2022.pdf (PDF, 3.37 MB) Appendix N - SLR S8 Aquatic Ecological Assessment.pdf (PDF, 5.09 MB) Appendix O - Onshore Additional Areas North Fauna.pdf (PDF, 7.84 MB) Appendix P - Ecological Risk Assessment - Norilup and Saltwater.pdf (PDF, 2.15 MB) Appendix Q - Burrowing Crayfish Literature Review.pdf (PDF, 1.06 MB) Appendix R - Onshore Upcoming Clearing Black Cockatoo Assessment.pdf (PDF, 9.98 MB) Appendix S - Onshore Site Targeted Black Cockatoo.pdf (PDF, 9.81 MB) Appendix T - 2018 Vert, SRE_Targeted_Biologic.pdf (PDF, 12.75 MB) Appendix U - Subfauna_Bennelongia.pdf (PDF, 1.78 MB) Appendix V - Landloch Erodibility testing and Erosion Modelling.pdf (PDF, 20.14 MB) Appendix W - ContaminationAssessment_Historical Mining Areas.pdf (PDF, 29.59 MB) Appendix X - Rehab Materials Characterisation.pdf (PDF, 3.76 MB) Appendix Y - GHD Kinetic Leach Testing.pdf (PDF, 11.77 MB) Appendix Z - Waste Rock Management Plan.pdf (PDF, 392.75 KB) 2. Decision on whether to assess this proposal Chair's Determination Assess - Public Environmental Review Extract of determination Greenbushes Lithium Mine: Waste Rock Landforms, Salt Water Gully Dam and additional clearing for infrastructure (significant ame (PDF, 171.73 KB) Preliminary Environmental Factors Air Quality Greenhouse Gas Emissions Social Surroundings Flora and Vegetation Terrestrial Environmental Quality Terrestrial Fauna Inland Waters Date published Monday, 19 May, 2025 3. Assessment Scoping Environmental scoping document Final ESD Approved 10925.pdf (PDF, 1.26 MB) Approved Monday, 1 September, 2025 Change to proposal during assessment under s. 43A s. 43A notice s. 43A - 161225.pdf (PDF, 4.8 MB) Date of approval s. 43A Tue, 16/12/2025 - 12:00