Lake Wells Potash Project

Project
Proposal description

Australian Potash Limited proposes to abstract brine resources to produce a sulfate of potash (SOP) product at the Lake Wells Potash Project.

The proposal area is located on and adjacent to the Lake Wells Playa Lake system (salt lake terrain), approximately 160km north-northeast of Laverton in Western Australia.

The proposal would include construction of an SOP processing plant, brine abstraction bores, evaporation ponds, raw water bore field, accommodation village and other associated infrastructure.

Disturbance associated with the proposal would be up to 2466 hectares on Playa and up to 746 hectares off Playa. Groundwater abstraction for the proposal would be up to 40 Gigalitres per annum of brine and up to 1.8 Gigalitres per annum of fresh/brackish water.

Assessment Number
2144
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
Date published
3. Assessment
Scoping
Approved
Environmental Review
Date Published (Environmental Review documentation)
Minor or preliminary work under s. 41A(3)
Date of approval s. 41A(3)
Change to proposal during assessment under s. 43A
Date of approval s. 43A
4. EPA Report on assessment
EPA Report Number
1688
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 1162 - Changes:
• Realignment of the on-playa development envelope and operations resulting in 498 ha increase in the development envelope and reduction of disturbance by 1,015 ha • Realignment of the off-playa development envelope and operations resulting in 2,199 ha reduction in development envelope and reduction in clearing of 247 ha • Increase the rate of brine abstraction in the first 16 years to 21.3 GL per annum with abstraction rates dropping during years 17 to 30, resulting in an overall abstraction of up to 597 GL over the life of the project • Increase in process/potable water abstraction by 0.3 GL per annum.

Changes approved under S45c on 25 January 2022

Date of approval s. 45C