Project Proponent Top Iron Pty Ltd Proposal description Construct and operate a shallow open pit iron ore mine and associated infrastructure on the Mt Gibson Pastoral Lease in the Mid-West of Western Australia. Assessment Number 1952 Region Mid West Referred under EP Act s38 Industry sector Iron Ore Last updated August 15, 2013 Current Status Ministerial Statement published 1. Referral Referral documentation Appendix Referral Form (PDF, 114.97 KB) Appendix 1 Table of contents (PDF, 22.59 KB) Appendix 2 Flora survey (PDF, 2.03 MB) Appendix 3 Fauna Survey (PDF, 2.88 MB) Appendix 4 Malleefowl (PDF, 2.1 MB) Appendix 5 Fauna habitat assessment (PDF, 2.26 MB) Appendix 6 Subterranean Fauna Assessment (PDF, 3.54 MB) Appendix 7 Short Range Endemic Invertebrate Assessment (PDF, 5.55 MB) Appendix 8 Hydrology Study (PDF, 5.52 MB) Appendix 9 Geochemical assessment (PDF, 602.69 KB) Appendix 10 Summary of Consultation (PDF, 30.02 KB) Appendix 11 Summary of Consultation (PDF, 4.06 MB) 2. Decision on whether to assess this proposal Chair's Determination Assess - Assessment on Proponent Information - Category A Extract of determination Chaiman's Determination - Mummaloo Iron Ore Project (PDF, 21.94 KB) Preliminary Environmental Factors Flora and Vegetation Terrestrial Fauna Date published Monday, 3 December, 2012 4. EPA Report on assessment EPA Report Number 1485 EPA Report Report 1485 - Mummaloo Iron Ore Project (PDF, 1.34 MB) Proponent documents Environmental Review Document - Mummaloo Iron Ore Project (PDF, 1001.96 KB) Mummaloo Iron Ore Project API Appendices (ZIP, 39.37 MB) Appendix 2 Combined figures (PDF, 1.97 MB) Key Environmental Factors Flora and Vegetation Terrestrial Fauna Date published Monday, 8 July, 2013 Appeals close Monday, 22 July, 2013 5. Decision on proposal and implementation of proposal Ministerial Statement Date of approval Thursday, 15 August, 2013 Ministerial Statement Ministerial Statement 943 - Mummaloo Iron Ore Project (PDF, 1.16 MB)