Inquiry under s46 regarding proposed amendments to the Onslow Solar Salt Project, the subject of  Ministerial Statement 401.

The changes to the project are to allow the start-up production to increase from 1.5 Mtpa to 2.5 Mtpa. Modifications proposed include:

  • expansion of condenser pond area from 70 km2 to 80 km2;
  • expansion of the crystalliser pond area from 7.2 km2 to 8.2 km2;
  • area for storage of bitterns;
  • extension of the jetty structure by 300 m;
  • extension of the dredged approach channel offshore, from 4 km long and -9 m (Chart Datum) deep to 9.6 km long and -10.8 m deep;
  • increased volume of spoil from 600,000 m3 to 3,000,000 m3 and relocation of spoil dumping sites from the east to the west of the proposed shipping channel; and
  • provision of alternate access/service corridors within the project area

Ministerial Statement 168, 401 and 451 have been superseded by Ministerial Statement 1257, available here: Onslow Solar Salt Project.

Assessment Number
1092
Region
Referred under EP Act
s46
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
4. EPA Report on assessment
EPA Report Number
857
Key Environmental Factors
Date published
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 451 – Increase in production capacity; decrease in haulage, washing and stacking rate; addition of three crystalliser ponds; decrease in bitterns discharge volume; correction of water use units – change to proposal approved under section 45C on 12 February 2013.