Project Proponent Water Corporation Proposal description In September 2011 Chevron Australia Propriety Limited (CAPL) and the Department of State Development (DSD) executed an agreement (Ashburton North State Development Agreement (Wheatstone Project) (SDA)) that required CAPL, to develop and execute a project that increased potable water supply to Onslow by 2 ML/day. This project is referred to as the Onslow Water Infrastructure Upgrade Project. After completion of the works the assets will be handed-over to the Water Corporation for ongoing ownership and operation. Region Pilbara Referred under EP Act s38 Industry sector Infrastructure Last updated December 08, 2016 Current Status Decision on whether to assess has been published 1. Referral Comment on this referral Onslow Water Infrastructure Upgrade Project, Shire of Ashburton Referral documentation Appendix F DOW Letter of Intent.pdf (PDF, 2.43 MB) Appendix G Water Quality for FEED.pdf (PDF, 162.74 KB) Appendix H Definition of Impediments to Residual Saline Stream Disposal Report.pdf (PDF, 1.98 MB) Appendix I Conceptual Design for Injection of the Residual Saline Stream.pdf (PDF, 15.85 MB) Appendix J Processing and Disposal of Radionuclides as Solid Waste.pdf (PDF, 1.77 MB) Appendix K NORM Risk Assessment at Quick Mud Creek.PDF (PDF, 13.31 MB) Appendix L Risk Assessment on Constituents of Residual Saline Stream.PDF (PDF, 6.14 MB) 2. Decision on whether to assess this proposal Chair's Determination Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. Advice given (Appealable) Extract of determination Chairman's Determination - Onslow Water Infrastructure Upgrade Project (PDF, 140.68 KB) Preliminary Environmental Factors Terrestrial Fauna Inland Waters Environmental Quality Public advice Public Advice - Onslow Water Infrastructure Upgrade Project (PDF, 110.96 KB) Date published Monday, 21 July, 2014