Parker Range (Mount Caudan) Iron Ore Project

Project
Proposal description

The proposal is for the development and operation of the Parker Range Project, located in the Mount Caudan section of the Parker Range within the Shire of Yilgarn. It includes the development and operation of an above and below the watertable greenfields iron ore mine and associated infrastructure. An existing gazetted road (Parker Range Road) runs across the ore body. A gazetted bypass road would be required around the proposed mine site requiring approximately 10 ha of clearing. Ore from the proposal would be transported via existing roads and a new 7 km section of private road to the proposed Moorine Rocks rail siding and then via existing rail infrastructure to port facilities on the coast. The mine would operate for up to 10 years and have a potential throughput of up to 4 million tonnes per annum.

Assessment Number
1811
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Extract of determination
Date published
3. Assessment
Scoping
Approved
Environmental Review
Environmental Review documentation
Proponent response to submissions
4. EPA Report on assessment
EPA Report Number
1410
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes
s. 45C amendments

Attachment 1 to Ministerial Statement 892 - Changes:

  • Change in development envelope
  • Change in disturbance footprint and vegetation clearing
  • Change in open pit dimensions
  • Removal of tailings storage facility
  • Change in pit dewatering volume
  • Change in surplus dewater management

Changes to conditions approved under S45C on 26 June 2020.

Date of approval s. 45C
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email