Pinjar Gas Turbine Power Station (s46)

Project
Proposal description

Inquiry under s46 regarding a proposal to increase the generating capacity of the Pinjar station by a nominal 340MW. This increased capacity would be provided through the installation of:

  • a fourth Frame 9 (nominally llOMW) gas turbine, together with;
  • four waste heat boilers and two 115MW steam turbines with associated infrastructure.

This proposal will increase the total potential generating capacity of the Pinjar station from a nominal 575MW (7 times 37MW plus 3 times 105MW) to 915MW (575MW plus 340MW).

Assessment Number
866
Region
Referred under EP Act
s46
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Date published
4. EPA Report on assessment
EPA Report Number
773
Date published
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email