Proposed Harvey to Kwinana 330Kv Transmission Line

Project
Proposal description

The proposal is for a 330 kV transmission line from Harvey to Kwinana, a distance of approximately 102 km.

The first 51 km of the route parallels the existing Bunbury - Cannington 132 kV line from the Harvey Substation site almost to Pinjarra. There are a number of deviations to avoid major road intersections, dwellings and their environs and Pinjarra townsite. Following this , the route joins the existing Muja - Southern Terminal 330 kV line and follows it for most of the next 44 km. There is a deviation around existing domestic dwellings and small holdings at Anketell and the line then remains in a separate easement for the remaining 4 km to Mandogalup. The final 7 km of the line will be strung on the spare side of the double circuit structures presently carrying the Kwinana- Southern Terminal330 kV line.

Assessment Number
50
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
3. Assessment
Environmental Review
Environmental Review documentation
4. EPA Report on assessment
EPA Report Number
338
Date published
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes