Project Proponent Lake Roe Gold Mining Pty Ltd Proposal description The proposal is to construct and operate a greenfield open cut and underground gold mine approximately 150 kilometres (km) east of the City of Kalgoorlie Boulder in the eastern Goldfields region of Western Australia (WA). The proposal is located on the western margin of Lake Roe and will comprise associated ore stockpiles, waste rock landforms, mining related and general supporting infrastructure and a 50 km service corridor. Mining will occur below groundwater level requiring dewatering of the open pit and underground mines. The proposal will mine an estimated 7.85 million tonnes of ore over a 9 year mine life. The mined ore will be transported offsite for processing at the Rebecca processing hub. The Development Envelope is 1,543 hectares (ha) with a Disturbance Footprint of 557.7 ha. Region Goldfields Esperance Referred under EP Act s38 Industry sector Gold Last updated March 25, 2026 1. Referral Comment on this referral Roe Gold Project Comment period Wednesday, 25 March, 2026 to Tuesday, 31 March, 2026 Referral documentation Referral form (PDF, 800.98 KB) Proposal content document (PDF, 10.82 MB) Supporting document (PDF, 45.41 MB) Appendix A_ Roe Gold Project Bombara Hydrogeological Dewatering Assessment.pdf (PDF, 25.86 MB) Appendix B_ Bombara Project Lake Roe Flood Depth Assessment.pdf (PDF, 13.57 MB) Appendix C_ Roe-Rebecca Haul Road- Surface Water Environmental Assessment.pdf (PDF, 12.85 MB) Appendix D_ Lake Roe Hydraulic Behaviour Desk Study.pdf (PDF, 7.43 MB) Appendix E_ Preliminary Risk and Discharge Assessment for Lake Roe.pdf (PDF, 9.39 MB) Appendix F_ Rebecca to Roe Haul Road, Detailed Flora and Basic Fauna Survey.pdf (PDF, 19.81 MB) Appendix G_ Lake Roe Project Detailed Flora Survey.pdf (PDF, 9.62 MB) Appendix H_ Lake Roe Project Short Range Endemic (SRE) Invertebrate Survey and Assessment.pdf (PDF, 4.37 MB) Appendix I_ Short Range Endemic Habitat Mapping for the Roe and Rebbecca Gold Projects Haul Road.pdf (PDF, 1.37 MB) Appendix J_ Lake Roe Gold Project Subterranean Fauna Level 1 Assessment.pdf (PDF, 7.03 MB) Appendix K_ Basic Vertebrate Fauna Survey Rebecca to Lake Roe Haul Road.pdf (PDF, 76.28 MB) Appendix L_ Basic Vertebrate Fauna Survey Lake Roe Gold Project.pdf (PDF, 36.59 MB) Appendix M_ Lake Roe Project -Kopai Crescent and Bombara Waste Characterisation.pdf (PDF, 10.43 MB) Appendix N_Lake Roe Gold Project- Baseline Aquatic Ecology Study.pdf (PDF, 6.55 MB) Appendix R_ Aquatic Ecology Report.pdf (PDF, 11.86 MB)