Thunderbird Mineral Sands Project

Project
Proposal description

Sheffield Resources Limited is seeking approval to develop the Thunderbird Mineral Sands Project located on the Dampier Peninsula, approximately 75 kilometres southwest of Derby, Western Australia. The proposal is for a mineral sands operation with an estimated 40 year life of mine. Mineral product will be mined from the Thunderbird Deposit and processed onsite before being transported by road to the Derby Wharf for storage and subsequent export.

Assessment Number
2073
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
3. Assessment
Scoping
Approved
Environmental Review
Environmental Review documentation
Minor or preliminary work under s. 41A(3)
Date of approval s. 41A(3)
Change to proposal during assessment under s. 43A
4. EPA Report on assessment
EPA Report Number
1606
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
s. 45C amendments

Attachment 1 to Ministerial Statement 1080

Changes:
• Export of bulk products via Broome in addition to Derby
• Increase of the number of journeys per day between the Mine Site and Broome.
• Inclusion of the amount of bulk mineral sand products in Mega tonnes per annum
being exported from the Port of Broome in Table 2.
• Removal of the amount of storage for packaged mineral sand products at Broome
Port from Table 2.
• A 30 ha Increase in clearing for infrastructure and a 30 ha decrease in clearing for
mining.

Changes approved under s.45C on 8 November 2022.

Date of approval s. 45C
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email