Transmission Line from Pinjar Gas Turbine to Cataby Substation

Project
Proposal description

The proposal is to build a transmission line with a maximum capacity of 330 kV from the Pinjar gas turbine station to the Cataby substation. The transmission line, which is primarily lattice tower construction up to 60 m high, traverses State Forest 65 South (Gnangara Park), Bush Forever Site 380, Gingin Stock Route Nature Reserve, State Forest 65 North and private property.

The proposed line route is approximately 123 km long and involves the permanent clearing of up to approximately 2.9 ha of vegetation for the tower sites and tower access roads and the temporary clearing of up to approximately 38.4 ha for construction activities including line stringing. Of this, approximately 1.9 ha of permanent clearing and 23 ha of temporary clearing are within land managed by the Department of Conservation and Land Management (CALM).

The transmission line will be constructed in a 60 m management corridor where vegetation directly under the transmission line will be maintained at 9 m in height. The vegetation along the majority of the proposed route is less than 9 m in height and should not require management.

Assessment Number
1356
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
Scoping
Approved
Environmental Review
Environmental Review documentation
4. EPA Report on assessment
EPA Report Number
1046
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email