Uaroo Renewable Energy Hub

Project
Proposal description

Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Uaroo Renewable Energy Hub on the Uaroo and Emu Creek Pastoral Stations located 120 kilometres south of Onslow, in the Pilbara region of Western Australia. 

The proposal is to construct and operate a renewable energy generation hub to power Fortescue Metals Group Limited’s mining operations in the Pilbara. 

The proposal will generate electricity (up to 5.4 gigawatts) from up to 340 wind turbine generators and a solar farm. The proposal includes a battery energy storage system, substations, associated supporting infrastructure, tracks and roads, and corridors for electrical cabling. 

The proposal would include a disturbance footprint of up to 10,158 hectares (ha) within a development envelope of 61,525 ha.  

During construction, the proposal would require abstraction of up to 6.5 gigalitres at a rate of 1 gigalitre per annum (GL/a) of groundwater. During operation, groundwater abstraction would be up to 0.2 GL/a

Assessment Number
2341
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Assessment has been terminated under s40A of the EP Act
1. Referral
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
Termination of assessment under s40A
Date of termination
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email