Wagerup Alumina Refinery - Production to a Maximum Capacity of 4.7 Million Tonnes Per Annum and Associated Bauxite Mining (s. 46)

Project
Proposal description

The construction and operation of the Wagerup Alumina Refinery to a maximum capacity of 4.7 million tonnes per annum and its associated bauxite mining.

Inquiry under s46 regarding amendment of the conditions of Ministerial Statement 728.

Assessment Number
1919
Region
Referred under EP Act
s46
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Extract of determination
Preliminary Environmental Factors
Date published
4. EPA Report on assessment
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments

Amendment of conditions of Ministerial Statement 0728 – Wagerup Alumina Refinery - Production to a Maximum Capacity of 4.7 Million Tonnes Per Annum and Associated Bauxite Mining.

A Notice of Interim Conditions was issued for this Statement on 27 September 2016 and should be read in conjunction with this Statement and with Statement 728.

Post-assessment changes
Comments

Pursuant to section 46A(1) of the Environmental Protection Act 1986, the following Interim Implementation Conditions in this Notice are to have effect instead of implementation condition 4 of Statement 728 dated 14 September 2006, and replaces condition 4 of Statement 897.

These Interim Implementation Conditions are to be read in conjunction with Statement 728 and are to have effect until a further statement is published under section 45(5) as applied by section 46(8) of the Environmental Protection Act 1986. All other conditions of Statement 728 continue to have effect.

Date of approval (46a)