Project Proponent Verve Energy Proposal description The proposal is for construction of up to 100 wind turbines each up to 152 metres (m) high, with a capacity of up to 250 Megawatts and all associated infrastructure: electricity transformers; underground cabling; access tracks, all weather access to Garibaldi Willis Road; crane hardstands; a substation compound including a metering building, site office and workshop and a communication mast. The proposal location is 15 km north-east of Warradarge, Shire of Coorow and Shire of Carnamah. Region Mid West Referred under EP Act s38 Industry sector Power generation Last updated October 18, 2012 Current Status Decision on whether to assess has been published 1. Referral Referral documentation Referral Form and Development Report (ZIP, 5.56 MB) Annex 1 Planning and Context Statement (PDF, 1.17 MB) Annex 2 Landscape and Visual Impact (PDF, 8.34 MB) Annex 3 Flora, Vegetation and Fauna (PDF, 4.92 MB) Annex 4 Noise Impact (PDF, 4.41 MB) Annex 5 Background Noise Monitoring (PDF, 3.15 MB) Annex 7 Aviation Impact Statement (PDF, 6.62 MB) Annex 8 Planning Compliance Report (PDF, 1.34 MB) Annex 9 Verve Energy Safety and Health (PDF, 549.86 KB) Annex 10 Verve Energy Enviromental Policy (PDF, 52.21 KB) Annex 11 Draft Environmental Management Plan (PDF, 30.12 KB) Figures from 1 to 20 (ZIP, 5.51 MB) 2. Decision on whether to assess this proposal Chair's Determination Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. Advice given (Appealable) Extract of determination Chairman's Determination - Warradarge Wind Farm (PDF, 21.39 KB) Preliminary Environmental Factors Terrestrial Fauna Public advice Public Advice - Warradage Wind Farm (PDF, 714.07 KB) Date published Monday, 24 September, 2012