Project Proponent API Management Pty Limited Proposal description The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure. Assessment Number 1943 Region Pilbara Referred under EP Act s38 Industry sector Infrastructure Iron Ore Last updated November 12, 2018 Current Status Ministerial Statement published 1. Referral Referral documentation Referral Document -West Pilbara Iron Ore Project Stage 2 – Hardey Proposa (PDF, 2.32 MB) Appendix 2 WPIO Project Stage 2 Hardey Proposal Supporting Information (PDF, 31.12 MB) 2. Decision on whether to assess this proposal Chair's Determination Assess - Assessment on Proponent Information - Category A Extract of determination Chairman's Determination - West Pilbara Iron Ore Project Stage 2 – Hardey Proposa (PDF, 22.57 KB) Preliminary Environmental Factors Social Surroundings Flora and Vegetation Terrestrial Fauna Hydrological Processes Inland Waters Environmental Quality Date published Monday, 8 October, 2012 4. EPA Report on assessment EPA Report Number 1474 EPA Report Report 1474 - West Pilbara Iron Ore Project Stage 2 - Hardey Proposal (PDF, 5.87 MB) Proponent documents Appendix 1 API Documents Ground water modelling (PDF, 18.66 MB) Appendix 2 Noise Impact Assessment (PDF, 2.4 MB) Appendix 3 Particulate Modelling Assesment (PDF, 1.97 MB) Appendix 4 Soils and Landscape Assessment (PDF, 35.01 MB) Appendix 5 Subterranean Fauna Assessment (PDF, 7.62 MB) Appendix 6 Aquatic Ecosystem Surveys (PDF, 4.98 MB) Appendix 7 Hardey Rail Corridor Fauna Survey (PDF, 16.4 MB) Appendix 8 Vegetation and Flora Survey (PDF, 12.05 MB) Appendix 9 Vegetation and Flora Survey (PDF, 41.7 MB) Appendix 10 Hardey Proposal stage 2 (PDF, 3.19 MB) Appendix 11 Hardey Proposal stage 2 Supporting Information (PDF, 31.12 MB) Appendix 12 Hardey Proposal stage 2 Supporting Information Development Envelopes (PDF, 1.56 MB) Key Environmental Factors Flora and Vegetation Terrestrial Fauna Hydrological Processes Inland Waters Environmental Quality Date published Monday, 13 May, 2013 Appeals close Monday, 27 May, 2013 5. Decision on proposal and implementation of proposal Ministerial Statement Date of approval Wednesday, 21 August, 2013 Ministerial Statement Statement 944 - West Pilbara Iron Ore Project Stage 2 – Hardey Proposa (PDF, 491.77 KB) Post-assessment changes Section 46 inquiry West Pilbara Iron Ore Project Stage 2 - Hardey Proposal (s46) [2182]