Project Proponent City of Busselton Proposal description City of Busselton proposes to construct a new route into Busselton. The proposal involves the development of a new two-lane road and bridge linking Causeway Road to Cammilleri Street, including a new bridge over the Vasse river. Disturbance associated with the proposal would include construction on the banks of the Vasse River and removal of 0.56 hectares of native vegetation. Region South West Referred under EP Act s38 Industry sector Infrastructure Last updated April 09, 2018 Current Status Decision on whether to assess has been published 1. Referral Comment on this referral Busselton Eastern Link Project Referral documentation Referral Form.pdf (PDF, 10.61 MB) Supporting document.pdf (PDF, 4.27 MB) Appendix 1 - City of Busselton Council minutes 8 June 2016.pdf (PDF, 755.84 KB) Appendix 2 – Draft design drawings.pdf (PDF, 22.64 MB) Appendix 4 - Reconnaissance flora, vegetation and fauna survey.pdf (PDF, 7.73 MB) Appendix 5 – Detailed flora and vegetation survey.pdf (PDF, 5.62 MB) Appendix 6 – Acid sulfate soils investigation report.pdf (PDF, 4.7 MB) Appendix 7 – Construction Environmental Management Plan.pdf (PDF, 1.47 MB) Appendix 8 – Waterway assessment.pdf (PDF, 12.32 MB) Appendix 9 – Baseline assessment of Carter’s Freshwater Mussel.pdf (PDF, 471.93 KB) Appendix 10 – Temporary relocation of Carter’s Freshwater Mussel.pdf (PDF, 1.87 MB) 2. Decision on whether to assess this proposal Chair's Determination Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. Advice given (Appealable) Extract of determination Busselton Eastern Link Project (PDF, 200.21 KB) Preliminary Environmental Factors Social Surroundings Flora and Vegetation Terrestrial Environmental Quality Hydrological Processes Inland Waters Environmental Quality Public advice CMS17294 -Advice-090418.pdf (PDF, 438.17 KB) Date published Monday, 9 April, 2018