This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2024
Hinckley Range Pty Ltd proposes to mine nickeliferous limonite ore from the Wingellina deposit located approximately 1,400 km north-east of Perth in the Shire of Ngaanyatjarraku close to the Northern Territory and South Australia borders Read more...Last updated: November 25, 2024
OZ Minerals Musgrave Operations Pty Ltd propose to develop the West Musgrave Copper and Nickel Project, located in the West Musgrave Ranges of Western Australia, approximately 1,300 km north-east of Perth near to the intersection of the borders between Western Australia, South Australia and the Northern Territory. The nearest towns include the Indigenous Communities of Jameson (Mantamaru) 26 km north, Blackstone (Papulankutja) 50 km east, and Warburton (Milyirrtjarra) 110 km west of the... Read more...Last updated: November 25, 2024
The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...Last updated: November 25, 2024
The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...Last updated: November 25, 2024
The Proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. Read more...Last updated: November 25, 2024
The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore. This Ministerial Statement was superseded by Statement 1026 and Statement 1027 published on 4 February 2016. Read more...Last updated: November 25, 2024
AGI Operations Pty Limited propose to construct and operate a gas processing plant and pipeline associated with the development of the West Erregulla gas field, located approximately 230 kilometres (km) north-east of Perth, and 50 km south-east of Dongara, Western Australia. The processing plant will process gas produced from third party owned upstream wells. The processed gas will then be transported via a new interconnecting pipeline to the Dampier to Bunbury Natural Gas Pipeline (DBNGP). The... Read more...Last updated: November 25, 2024
FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...Last updated: November 25, 2024
The Proposal is for the above and below water table mining of iron ore from five open cut pits, located approximately 30 km north of Nullagine. The Proposal includes the development of mine pits and associated infrastructure including but not limited to crushing and screening facilities, waste landforms, run of mine pad, access roads, solar field, administration, accommodation camp, stockpile and laydown areas, borrow pits, groundwater bores and transfer infrastructure, explosives magazine,... Read more...Last updated: November 25, 2024
The Western Green Energy Hub is a proposal to design, construct and operate a large-scale wind and solar power project to produce value added products, with the base case assuming green ammonia production. The proposal is situated on WA Mirning Native Title determined land in the far southeast of Western Australia in the Shire of Dundas and City of Kalgoorlie-Boulder, to the northwest of Eucla in the South Coast Region. The proposal will be located on Unallocated Crown Land and pastoral leases... Read more...Last updated: November 24, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 21, 2024
Proposal by the Water Corporation to renew a groundwater licence to continue abstraction from the Millstream aquifer of 6 gigalitres per annum (GL/a). The Water Corporation hold an existing temporary groundwater licence to abstract 3GL/a from the Millstream aquifer until February 2027 (GWL205069), enabling combined abstraction of up to 9GL/a. The referrer of the proposal contends that this significantly exceeds the Department of Water and Environmental Regulation’s sustainable limit of 6 GL/a,... Read more...Last updated: November 18, 2024
The proposal is to increase the hours of operation of the existing Kemerton Power Station from 2,000 hours/annum to 13,800 hours/annum. The proposal does not involve any clearing, construction, commissioning or development of new equipment or infrastructure. Read more...Last updated: November 12, 2024
Chalice Mining Limited proposes development of the Gonneville Nickel-Copper-Platinum Group Element (PGE) Project. The proposal is located within the Wheatbelt Region, approximately 70km north-east of Perth, 25 km west of Toodyay and 25 km south-east of Bindoon. The proposal comprises of a mine site including an open mine pit and/or underground mine and infrastructure corridor options for water and power supply. Road and/or existing rail infrastructure will be utilised in transporting supplies... Read more...Last updated: November 4, 2024
The Proposal is for the development of the Rhodes Ridge Iron Ore Project (the Proposal), located approximately 40 kilometres north-west of Newman, in the Shire of East Pilbara. The Proposal requires a disturbance footprint of up to 14,850 hectares within a 61,301 hectares Development Envelope. The Proposal includes the development of new above and below water table deposits, and associated activities. The proposal includes but is not limited to: development of new deposits including above and... Read more...Last updated: November 4, 2024
Alcoa of Australia Limited’s (Alcoa) clearing permit application (CPS 10626/1) to the Department of Energy, Mines, Industry Regulation and Safety is for the clearing of native vegetation for geotechnical investigations. Under the original CPS application, referred to the EPA, Alcoa sought to clear 20 hectares of native vegetation (ha). However, Alcoa has since amended the application to reduce the area to 11ha. The geotechnical investigations are located at Myara North which is a future mine... Read more...Last updated: November 1, 2024
Alinta Energy (subsidiary of Alinta DEWAP Pty Ltd) currently owns and operates the existing Port Hedland Power Station (PHPS) located within the Boodarie Strategic Industrial Area approximately 12 km south of the Port Hedland town centre and approximately 5 km west of South Hedland, ., The Proposal utilises new technologies providing more energy efficient and reliable power to customers in the Port Hedland area. This will include the installation of a 60 Megawatts (MW) natural gas fuelled... Read more...Last updated: October 21, 2024
Strike West Pty Ltd propose to undertake a three-dimensional (3D) seismic acquisition survey within permits EP368, EP426, EP469, EP320 and L22; and acquisition of 2D seismic data along a single east-west seismic line within EP320 to tie into the existing Munganooka well. The proposal is located within the Shires of Three Springs, Irwin and Mingenew in the Wheatbelt region of Western Australia. The proposal comprises a disturbance footprint of 919.11 linear kilometres within a development... Read more...Last updated: October 20, 2024
The Intractable Waste Disposal Facility (IWDF) is 75km north-east of Koolyanobbing and approximately 53km north-east of Jaurdi Station Homestead (unoccupied). The site occupies a 25km 2 Crown Reserve No. 42001 and is accessed by a 100km long dedicated unsurfaced road (Crown Reserve No. 44102) that extends northward from the Boorabbin Siding on Great Eastern Highway. This inquiry under s46 is in regard to consolidation of environmental conditions of Ministerial Statements 44 , 205 , 353 and 533... Read more...Last updated: October 16, 2024
Iluka proposes to develop the Tutunup Mineral Sands Project, located approximately 195 km south of Perth, and 17 km east of Busselton. The proposal involves mineral sands mining, including the development of mine pits, processing plant, dams for water and clay fines management, material stockpiles and associated supporting infrastructure. Up to 4.02 gigalitres of water would be required to support the proposal. Heay mineral concentrate would be transported for further processing at the Capel... Read more...