Project Proponent EPA Report and Recommendations released - not appealable Proposal description The proposal is for the construction and operation of a 140 megawatt (MW) thermal power station and associated supporting infrastructure located directly east of Kalgoorlie-Boulder in the Goldfields region of Western Australia. The proposed power station will supply electricity to Kalgoorlie Consolidated Gold Mines (KCGM) and connect to the South West Interconnected System (SWIS). The power station will be capable of operating using natural gas, distillate and future alternative fuel sources such as bioderived, synthetic and hydrogen-enriched fuels. The proposal will require 44.24 hectares of disturbance within a 101.34 hectare development envelope. Assessment Number 2581 Region Goldfields Esperance Referred under EP Act s38 Industry sector Infrastructure Power generation Last updated March 06, 2026 Current Status Decision on whether to assess has been published 1. Referral Comment on this referral Kalgoorlie Thermal Power Project Referral documentation Referral form (PDF, 343.66 KB) Proposal content document (PDF, 2.37 MB) Supporting document (PDF, 14.48 MB) Appendix A - Wartsila-31df tech specs.pdf (PDF, 365.69 KB) Appendix B - Fimiston Flora Survey.pdf (PDF, 12.37 MB) Appendix C - Reconnaissance flora and vege survey 2022.pdf (PDF, 12.24 MB) Appendix D - Basic and Targeted Fauna Survey.pdf (PDF, 18.77 MB) Appendix E - Targeted Malleefowl Survey.pdf (PDF, 44.19 MB) Appendix G - Greenhouse Gas Management Plan.pdf (PDF, 453.41 KB) Appendix H - Air Quality Assessment.pdf (PDF, 6.32 MB) Appendix I - Noise Assessment.pdf (PDF, 8.38 MB) Appendix J - Hydrology Assessment.pdf (PDF, 40.24 MB) Appendix K - Baseline Contamination Assessment.pdf (PDF, 5.49 MB) 2. Decision on whether to assess this proposal Chair's Determination Assess - Referral Information Extract of determination Kalgoorlie Thermal Power Project (PDF, 167.37 KB) Preliminary Environmental Factors Greenhouse Gas Emissions Date published Friday, 6 March, 2026