S45C changes to proposal
| Title | S45C changes to proposal | Ministerial Statement | Last updated |
|---|---|---|---|
| Sanjiv Ridge Project - Stage 2 | Attachment 1 to Statement 1197 - Change to condition 4-3. Change approved under s. 45C on 29 September 2023. Attachment 2 to Statement 1197 - Increase the authorised mining rate from 3 million tonnes per annum (Mtpa) to 7 Mtpa. Change approved under s. 45C on 21 January 2026. |
Statement 1197.pdf (PDF, 1.57 MB) | |
| Gabanintha Vanadium Project | Attachment 1 to Statement 1242 - Amend and replace the proposal description to allow supply of abstracted groundwater to other users outside of the development envelope. Amend and replace condition A1-1 to define total and annual groundwater abstraction rates from the project including the Water Supply Areas, and clarify the elements included in the project life and the commencement date. Spatially define the amendment to the approved proposal in figure 2 and schedule 1. Administrative change to correct an unintentional error in the disturbance footprint in figure 2 and schedule 1 and include the revised disturbance footprint. Administrative change to amend the proponent address. Administrative change to correct an unintentional omission in condition A1-1. Change to conditions approved under s. 45C on 17 December 2025. |
Statement 1242.pdf (PDF, 2.2 MB) | |
| Revised Proposal for the Roy Hill Iron Ore Mine | Attachment 1 to Ministerial Statement 1189 - Condition 12-3 is deleted, and replaced. Change approved under S45C on 24 November 2022. Attachment 2 to Ministerial Statement 1189 - Remove the total dissolved solid (TDS) limit of 50,000 mg/L for aquifer reinjection of excess mine dewater. Remove the TDS limit of 50,000 mg/L for dust suppression using excess mine dewater. Replace the introduction to reference a Proposal Content Document for the purposing of describing the approved proposal. Replace condition 1-1 to reflect the removal of the TDS limits. Change approved under S45C on 2 July 2024. Attachment 3 to Ministerial Statement 1189 - Changes: Changes approved under S45C on 7 May 2025. Attachment 4 to Ministerial Statement 1189 - Administrative change in the development envelope and disturbance footprint extents of condition 1-1. Change approved under S45C on 28 August 2025. Attachment 5 to Ministerial Statement 1189 - Administrative change to condition 12-3, to amend a clerical error and capture PEOF contributions for the night parrot, as specified in condition 12-1(9). Administrative change to condition 12-9, for grammatical accuracy to ensure clarity.. Change approved under S45C on 2 December 2025. |
Statement 1189.pdf (PDF, 7.88 MB) | |
| Wallaby Gold Mine Project | Attachment 1 to Statement 551 - Change to Schedule 1 approved under s. 45C on 23 June 2006. Attachment 2 to Statement 551 - Increased proposal life from 2015 to 2051 to allow reactivation of Wallaby Waste Rock Landform to receive waste from Wallaby Underground. Inclusion of a development envelope and contemporary updates to some proposal elements. Change approved under s. 45C on 2 December 2025. |
Statement 551.pdf (PDF, 1.18 MB) | |
| Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning: Revised Proposal - Fimiston South Project | Attachment 1 to Statement 1258 - Administrative change to correct a clerical error in condition B3-5(3). |
Statement 1258.pdf (PDF, 3.5 MB) | |
| Mineral Sands Mine, Gingin | Attachment to Statement 666 - Increase in disturbance area from 280 hectares to 370 hectares - change to proposal under s45C approved on 31 October 2006. |
Ministerial Statement 666 (PDF, 1.01 MB) | |
| Murrin Murrin Nickel-Cobalt Project Stage 2 Expansion | Attachment 1 – The use of Pit2/3 for periodic tailings disposal – change to proposal approved under s45C on 31 January 2005. Attachment 2 – The construction and operation of a Heap Leach Facility located south-east of the existing Murrin Murrin processing plant (approximate coordinates GDA 391400mE, 6815800mE) as shown in Figure 1 – change to proposal approved under s45C on 8 December 2005. Attachment 3 – Changes to Schedule 1, Key Characteristics Table relating to the continued operation of the Heap Leach Facility allowing ore processing to remain at 0.5 Mtpa for ‘life of mine’ – change to proposal approved under s45C on 24 January 2012. Attachment 4 – Changes to Schedule 1, Key Characteristics table relating to the clearing of an additional 300 ha of vegetation to allow for the development of additional Pits, Waste Dumps and Ore Stockpiles – change to proposal approved under section 45C on 27 March 2013. Attachment 5 – Removal of Groundwater criteria from the Key Characteristics Table – change to proposal approved under section 45C on 20 December 2016. Attachment 6 - The change is to amend the authorised extent, including:
Change to proposal approved under section 45C on 17 September 2018. Attachment 7 – Reduce the authorised land disturbance within the development envelope at Attachment 8 – No additional clearing, emissions or discharges or changes to the life of mine. Ministerial Statement figures updated to include proposal supporting infrastructure previously presented in Attachment 6 and incorrectly omitted from Attachment 7 due to an administrative error. Figures updated to include water pipeline connections that were omitted due to an error of transcription in Attachment 6. The development envelope details in Table 2 updated to correctly reference mining and borefield development envelopes referenced in the corrected figures. The development envelope extent of 20,172 hectares (ha) in Table 2 has been moved to the correct location under ‘Pits, Waste Dumps and Ore Stockpiles’ in Table 2. – change to proposal approved under section 45C on 24 April 2024. Attachment 9 – Addition of an 849 hectare (ha) Hybrid Renewable Energy (HRE) development envelope. Clearing of 188 ha of native vegetation for the construction and operation of hybrid renewable energy system consisting of a solar farm, wind turbines, battery storage system and associated infrastructure within the HRE development envelope. Additional Proponent commitment (Schedule 2) required by Condition 2 to implement the MMO Hybrid Renewable Energy Project – Bird and Bat Adaptive Management Plan (2025). – change to proposal approved under section 45C on 8 October 2025. |
Statement 506.pdf (PDF, 10.09 MB) | |
| Hope Downs 4 Iron Ore Mine | Attachment 1 to Statement 854 – Realignment of the infrastructure corridor and the Kalgan Creek excess water pipeline realignment, and re-development and relocation of two existing groundwater bores – change to proposal approved under s45C on 28 March 2012. Attachment 2 to Statement 854 – Removal of Infrastructure Corridor Option 6, changes to Project Area – change to proposal approved under section 45C on 7 January 2013. Attachment 3 to Statement 854 – Change to Project Area to expand the excess water discharge infrastructure corridor – change to proposal approved under section 45C on 17 September 2013. Attachment 4 to Statement 854
The conceptual mine layout and associated infrastructure for the proposal in Schedule 1 of MS 854 (Figure 3) has been updated to reflect the changes described above and the elements of the proposal that have been implemented in accordance with the key characteristics of the approved proposal. The reference to figures depicting the location of the physical and operational elements have been corrected in the Key Characteristics Table (to Figures 2 and 3) as it is these figures that show the mine layout and associated infrastructure for the proposal. – change to proposal approved under section 45C on 2 October 2020. |
Ministerial Statement 854 and 932.pdf (PDF, 1.42 MB) | |
| Cataby Mineral Sands Project (s. 46) | Attachment 1 to Ministerial Statement 1017 - Changes: Change to conditions approved under S45c 14 May 2021. Attachment 2 to Ministerial Statement 1017 Development of three additional open pits. Development Envelope to increase to 3,288.7 ha. Area of Disturbance to increase to 2,988 ha. Disturbance Footprint to be indicative. Additional clearing of native vegetation of 9 ha to a total of 162.1 ha. Removal of the “overburden volume” element from the Proposal. Change to conditions approved under S45c on 15 September 2025. |
Statement 1017.pdf (PDF, 2.63 MB) | |
| Ravensthorpe Nickel Project (s46) | Attachment to Statement 633 – Redesign of the seawater intake facility – change to proposal approved under section 45C on 3 December 2004. Attachment 1 to Statement 633 – Increase the maximum allowable area of the evaporation pond from 250 hectares to 391 hectares – change to proposal approved under section 45C on 22 December 2008. Attachment 2 to Statement 633 – Construct and operate a Sands Reject Storage Facility - change to proposal approved under section 45C on 23 September 2010. Attachment 3 to Statement 633 – Increase in disturbance footprint of 282 ha and removal of elements considered not environmentally relevant or managed under other legislation – change to proposal approved under section 45C on 12 August 2014. Attachment 4 to Statement 633 - Changes:
Change to proposal approved under section 45C on 23 May 2019. Attachment 5 to Statement 633 – Expansion of Southern Mines and Processing Development Envelope by 0.06 ha. Expansion of Tamarine Limestone Quarry Development Envelope by 71.8 ha and disturbance by 76.7 ha. Increase Seawater Pipeline and Intake Development Envelope by 20.3 ha. Increase Access Corridor Development Envelope by 1.6 ha - change to proposal approved under section 45C on 4 March 2025. Attachment 6 to Statement 633 – Inclusion of wording in Table 2 to reflect the expansion of Southern Mines and Processing Development Envelope by 0.06 ha, authorised under Attachment 5 • Removal of reference to a windfarm • Correction of spelling error in Table 1. Change to proposal approved under section 45C on 10 September 2025. |
Ministerial Statement 633.pdf (PDF, 8.88 MB) |