Leslie Salt project, expansion of ponds, Port Hedland

Attachment 1 to Statement 147 - Increase in salt production to 3.2 million tonnes per annum. Section 45C change to proposal approved on 27 October 2004.

Attachment 2 to Statement 147 - Increase in salt production from 3.2 million tonnes per annum to approximately 4.5 million tonnes per annum for approximately 2 years from the start of mining. Section 45C change to proposal approved on 13 July 2005.

Attachment 3 to Statement 147 - Changes to Table 1, Schedule 1 - Key Characteristics Table. Section 45C change to proposal approved on 10 December 2013.

Attachment 4 to Statement 147 - Change to Bitterns Discharge Volume. Section 45C change to proposal approved on 23 April 2018.

Attachment 5 to Statement 147 - Removal of the 3.2 million tonnes per annum solar salt production limit from Attachment 4 of MS 147. Amendment to correct typographic error.. Section 45C change to proposal approved on 22 December 2022.

MS 147.pdf (PDF, 652.42 KB) December 21, 2022
Revised Proposal for the Roy Hill Iron Ore Mine

Attachment 1 to Ministerial Statement 1189 - Condition 12-3 is deleted, and replaced. Change approved under S45C on 24 November 2022.

Statement 1189.pdf (PDF, 4.3 MB) November 24, 2022
Thunderbird Mineral Sands Project

Attachment 1 to Ministerial Statement 1080

Changes:
• Export of bulk products via Broome in addition to Derby
• Increase of the number of journeys per day between the Mine Site and Broome.
• Inclusion of the amount of bulk mineral sand products in Mega tonnes per annum
being exported from the Port of Broome in Table 2.
• Removal of the amount of storage for packaged mineral sand products at Broome
Port from Table 2.
• A 30 ha Increase in clearing for infrastructure and a 30 ha decrease in clearing for
mining.

Changes approved under s.45C on 8 November 2022.

Statement 1080.pdf (PDF, 3.77 MB) November 8, 2022
Regional Resource Recovery Centre, Pt Lot 78 and Pt Lot 85 Bannnister Road, Canning Vale

Attachment 1 to Statement 517 - Changes:

  • Increase the processing capacity of co-mingled recyclables from 30,000 tonnes per year to 120,000 tonnes per year
  • Increase the waste acceptance rate from 115 tonnes per day to up to 500 tonnes per day
  • Extend the indicative operational hours of the Materials Recycling Facility from Monday to Saturday 0700 to 1900, to Monday to Saturday 0600 to midnight and Sunday 0600 to 1800.

Changes approved under S45c on 2 October 2020.

Statement 517.pdf (PDF, 1.81 MB) October 27, 2022
Jansz Feed Gas Pipeline Barrow Island Nature Reserve

Attachment 2 to Statement 769 - Changes: • Incorporation of Feed Gas Pipeline System description. • Amendment of descriptions of shore crossing and electrohydraulic umbilicals. Change approved 24 October 2022.

00769.pdf (PDF, 888.53 KB) October 24, 2022
Brockman Syncline 4 Iron Ore - Revised Proposal

Attachment 2 - Merging Area 1 and Area 2 into a single development envelope (Area 1) for mine pit and associated infrastructure; amendment to Schedule 2 coordinates defining the approved development envelope (Area 1); and update Figure 1 to reflect the above changes - change to proposal made under s45C approved on 26 August 2016.

Attachment 3 - Increase of clearing limit from 3560 ha to 4043 ha (483 hectare increase) - change to proposal made under s45C approved on 8 November 2019.

Attachment 4 - Increase clearing extent by 460 ha to total 4503 ha - change to proposal made under s45C approved on 1 September 2022.

Ministerial Statement 1000.pdf (PDF, 2.81 MB) September 1, 2022
Balla Balla Export Facilities

Attachment 1 to Statement 945: Change to the marine infrastructure to be constructed within the development envelope, decrease of 1 ha in the development envelope and a decrease in 0.1 ha of disturbance of sub-tidal habitat. Change to proposal approved under S45C on 23 January 2015

Statement 945.pdf (PDF, 1.99 MB) July 1, 2022
Sorby Hills Silver Lead Zinc Project

Attachment 1 to Ministerial Statement 964 - Access road extension to the realigned Moonamang Rd. Inclusion of accommodation village. Revision of Figures 1-3. Changes approved under s45C on 20 June 2022.

Statement No. 964.pdf (PDF, 2.76 MB) June 20, 2022
Northern Goldfields Interconnect Pipeline

Attachment 1 to Statement 1184 – Increase in the development envelope of 15 ha to provide an area for the Pinnacles Temporary Work Area construction, consisting of construction accommodation, laydown areas and associated infrastructure. Change to proposal approved under s45C 14 June 2022

Statement 1184.pdf (PDF, 1.53 MB) June 14, 2022
Scarborough Project Nearshore Component

Attachment 1 to Statement 1172 - Increase the authorised extent of nominal diameter of the trunkline from 32 inch to 36 inch. No amendments to implementation conditions. Changes approved under s45C on 14 June 2022.

Statement 1172.pdf (PDF, 811.61 KB) June 14, 2022