S45C changes to proposal

Title S45C changes to proposal Ministerial Statement Last updated
Byford Rail Extension

Attachment 1 to Statement 1183 - Change to the extent of the development envelope and locations of disturbance footprint and change to Figure 1 and associated spatial data. Change approved under s. 45C on 10 October 2024.

Statement 1183.pdf (PDF, 1.32 MB)
Utah Point Berth Project (Stage B)

Attachment 1 to Statement 788 - Removal of the references to Dust and Noise Suppression, and Stormwater Management from the Key Characteristics Table - change approved under s45C on 14 December 2015.

Ministerial Statement 788 (PDF, 2.07 MB)
State Barrier Fence Esperance Extension

Attachment 1 to Statement 1095 - Change to the authorised extent of the development envelope within which clearing and disturbance can occur. Change to the authorised extent of existing firebreaks and previously uncleared areas within which ongoing chaining can occur. Change to conditions related to terrestrial fauna (western ground parrot (Pezoporus flaviventris)). Changes approved under s. 45C on 18  September 2024

Ministerial Statement 1095.pdf (PDF, 1.69 MB)
Sodium Cyanide Plants (Liquid and Solid) at Kwinana and Transport of Sodium Cyanide by Road and Rail from Kwinana

Attachment 1 to Ministerial Statement 1196 - Amendment to the introduction, figures, schedule 1 and condition 1-1. Changes aproved under s. 45C on 27 August 2024.

Statement 1196.pdf (PDF, 1.77 MB)
Lumsden Point General Cargo Facility

Attachment 1 to Statement 967 - Include a 139.46 hectare development envelope for the temporary pipeline corridor; include DMMA B as a location for dewatering discharge; and update Figure 1 and delineation coordinates - change to proposal under s45C approved on 21 July 2017.

Attachment 2 to Statement 967 - Changes:

  • increase the dredging area development envelope by 6.9 ha to allow for deepening of the Stingray Creek Southern Swing Basin;
  • dredging volume increase by 400,000 m3 (total volume of 2.4 million m3); and
  • update Figure 1 and delineation coordinates.

Change to proposal under s45C approved on 14 April 2020.

Attachment 3 to Statement 967 -Changes:
• Include an increase to the causeway construction Development Envelope by 0.069 ha to allow for a straight path between DMMA C and the Land Backed Warf Area (total Development Area increase from 195.00 ha to 195.07 ha).
• Include an increase to average vertical dredge profile from 0.2 m to 0.5 m for berth pockets, shipping channel and turning basin dredging.
• Include onshore placement of remaining dredge material within Dredge Material Management Area C (DMMA C).- change to proposal under s45C approved on 27 September 2023.

Ministerial Statement 967.pdf (PDF, 1.48 MB)
Mineral sands mine, Dardanup (s46)

Attachment 1 to Statement 484 – Increase in disturbance area required for Tailings Pond – change to proposal approved under section 45C on 19 January 2004.

Attachment 2 to Statement 484 – Increase in maximum ore mining rate – change to proposal approved under section 45C on 28 June 2004.

Attachment 3 to Statement 484 – Multiple amendments to the Key Characteristics Table relating to project life, groundwater influence and water supply, as a result of the Dardanup Southern Extension Project – change to proposal approved under section 45C on 9 August 2012.

Attachment 4 to Statement 484 – Inclusion of the Waterloo Project into the Southern Extension – change to proposal approved under section 45C on 20 December 2013

Ministerial Statement 484 (PDF, 988.06 KB)
Western Extension to the Dardanup Mineral Sands Project to include the Burekup Mineral Sands Deposit

Attachment 1 to Statement 789 - Change to the Burekup West mine disturbance footprint area - section 45C change to proposal approved on 7 July 2010.

Attachment 2 to Statement 789 - Change to the Burekup West Mine disturbance footprint area – change to proposal approved under s45C on 8 July 2011.

Ministerial Statement 789 - Western Extension to the Dardanup Mineral Sand s Project (Burekup Mineral Sand Project) (PDF, 2.12 MB)
Wagerup Cogeneration Project

Attachment 3 to Statement 729 – Increase the operating hours of the Stage 1 configuration of the Wagerup Cogeneration Facility from 1,000 hours per year to 4,000 hours per year – change to proposal approved under section 45C on 9 March 2018.

Attachment 4 to Statement 729 – Installation of a battery energy storage system (BESS), with a battery power output of 100 megawatts. Change to proposal approved under section 45C on 1 April 2021.

Attachment 5 to Statement 729 – Increase to operating hours until 30 September 2025. Change to proposal approved under section 45C on 27 June 2024.

Statement 729.pdf (PDF, 3.35 MB)
Newmont Boddington Goldmine - Life of Mine Expansion

Attachment 1 to Ministerial Statement 971

Changes:

  • Increase the Authorised Extent of the development envelope from 11,712 hectares (ha) to 12,856 ha (Table 2).
  • Realignment of the disturbance footprint, with new Figures to delineate the change (Figure 1 and 2).

Change to conditions approved under s45c 17 May 2019.

Attachment 2 to Ministerial Statement 971 - Increase in the Authorised Extent of clearing of vegetation within the disturbance footprint (Table 2). Change to disturbance footprint (Figure 1). Change to conditions approved under s45c on 26 April 2024.

Statement 971.pdf (PDF, 4.61 MB)
Kwinana Gas-Fired Power Station (Water Cooled Condenser)

Attachment to Statement 698 - Amendment of Schedule 1 – Key Proposal Characteristics Table 1 - change to proposal approved on 15 August 2007.

Attachment 2 to Statement 698

  • Include an additional mode of operation
  • Increase the authorised limit of oxides of nitrogen (NOx)
  • Update location maps (Figures 1 and 2)

Changes approved under S45c on 3 November 2020.

Attachment 3 to Statement 698 - Increase in power generation capacity and thermal efficiency. Changes approved under S45c on 22 April 2024.

Statement 698.pdf (PDF, 2.37 MB)
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email