Project Proponent Greatland Pty Ltd Notice of Change of Proponent Notice of Change of Proponent - 161224.pdf (PDF, 156.93 KB) Proposal description Newcrest Operations Limited proposes to construct and operate the Telfer – Havieron Gold Mining Project (the Project). The Telfer Gold Mine is located about 55 km to the west of the Havieron Gold Mine and 400 km south-east of Port Hedland in the Great Sandy Desert region of Western Australia. The project includes: The open pit and underground mining and subsequent processing of gold-copper ore at the Telfer Gold with associated infrastructure including a 160 MW natural gas-fired power station, waste rock landforms, tailings storage facilities, accommodation village and borefields. A 440 km-long natural gas pipeline corridor from Port Hedland to the Telfer Gold Mine. The underground mining of gold-copper ore at the Havieron Gold Mine for processing at the Telfer Gold Mine, as well as the continued and/or expanded use of existing associated facilities at Havieron, including the underground decline to access the orebody, waste rock landforms, evaporation ponds, stockpiles, and accommodation village. The construction and operation of the Infrastructure Corridor between Telfer and Havieron to facilitate the transport of ore and other materials between Havieron and Telfer, including tailings and waste rock materials for the progressive backfilling of the Havieron Gold Mine, and the installation of a pipeline for water supply and a powerline within the corridor. Proposal Content Document Proposal Content Document - November 2025.pdf (PDF, 2.72 MB) Assessment Number 2446 Region Pilbara Kimberley Referred under EP Act s38 Industry sector Gold Last updated May 25, 2026 Current Status Ministerial Statement published 1. Referral Comment on this referral Telfer - Havieron Gold Mining Project Referral documentation Newcrest_Telfer-Havieron_Gold_Project_Referral_Supporting_Doc_v1-1.pdf (PDF, 35.15 MB) Significant Amendment - Telfer-Havieron Gold Mining Project Mar2023.pdf (PDF, 959.54 KB) Telfer-Havieron_Gold_Mine_Proposal_Content_Document_230404.pdf (PDF, 3.85 MB) AppxB_Vegetation&Flora_Reports.pdf (PDF, 32.12 MB) AppxC_Telfer-Havieron_SigSpeciesMP.pdf (PDF, 17.39 MB) AppxD_Terrestrial_Fauna_Reports.pdf (PDF, 32.59 MB) AppxE_Telfer-Havieron_GHG_Emissions_Assessment.pdf (PDF, 1.37 MB) AppxF_Telfer-Havieron_Gold_Project_Prelim_GHGMP.pdf (PDF, 1.07 MB) AppxG_Havieron_SubFauna.pdf (PDF, 9.74 MB) AppxH_Preliminary_MCPweb.pdf (PDF, 40.55 MB) AppxI_Havieron+Corridor_Surface_Water.pdf (PDF, 24.39 MB) AppxJ_H3_Hydrogeological_Report_Havieron.pdf (PDF, 23.28 MB) AppxK_Havieron_Soils_Report.pdf (PDF, 22.09 MB) AppxL_Waste_Characterisation_Reports.pdf (PDF, 16.82 MB) AppxM_Telfer-Havieron_Offset_Strategy.pdf (PDF, 3.53 MB) AppxN_TelferMS605+606_CAR_2021+22.pdf (PDF, 2.69 MB) 2. Decision on whether to assess this proposal Chair's Determination Assess - Additional Assessment Information (public review) Extract of determination Telfer – Havieron Gold Mining Project (PDF, 315.38 KB) Preliminary Environmental Factors Flora and Vegetation Inland Waters Social Surroundings Subterranean Fauna Terrestrial Environmental Quality Terrestrial Fauna Date published Monday, May 27, 2024 - 12:00 3. Assessment Environmental Review Make a submission Telfer-Havieron Gold Mining Project - Additional Information Environmental Review documentation Proposal Content Document (PCD).pdf (PDF, 1.15 MB) Revised Referral Supporting Document - Rev 6.pdf (PDF, 90.77 MB) RFI Appendix 1 - JBS&G Flora and Vegetation EPA RFI Responses Memo.pdf (PDF, 582.93 KB) RFI Appendix 2 - Biologic Vertebrate Fauna EPA RFI Responses Memo.pdf (PDF, 887.92 KB) RFI Appendix 2a - Reports of acoustic recorder analysis (6).pdf (PDF, 1.55 MB) RFI Appendix 3 - MineEarth Mine Closure Plan EPA RFI Responses Memo.pdf (PDF, 157.74 KB) RFI Appendix 4 - Rockwater Surface Water Assessment EPA RFI Memo (1).pdf (PDF, 1.32 MB) RFI Appendix 5 - Worley Hydrogeology EPA RFI Responses Memo (1).pdf (PDF, 38.18 MB) RFI Appendix 6 - Updated figures.pdf (PDF, 20.92 MB) RFI- Response table.pdf (PDF, 872.28 KB) Appendices cover and contents pages.pdf (PDF, 478.64 KB) AppxA_Stakeholder Engagement Register.pdf (PDF, 403.48 KB) AppxB_Flora and Vegetation Reports.pdf (PDF, 31.62 MB) AppxC_Significant Species Management Plan.pdf (PDF, 16.6 MB) AppxD_Terrestrial Fauna Reports.pdf (PDF, 31.19 MB) AppxE_Greenhouse Gas Emissions Report.pdf (PDF, 1.08 MB) AppxF_GHG Management Plan and Peer Review.pdf (PDF, 1.54 MB) AppxG_Scope 3 Greenhouse Gas Assessment Report.pdf (PDF, 504.94 KB) AppxH_Subterranean Fauna Reports.pdf (PDF, 9.55 MB) AppxI_Preliminary Mine Closure Plan_Part1.pdf (PDF, 48.35 MB) AppxI_Preliminary Mine Closure Plan_Part2.pdf (PDF, 49.88 MB) AppxI_Preliminary Mine Closure Plan_Part3.pdf (PDF, 49.72 MB) AppxI_Preliminary Mine Closure Plan_Part4.pdf (PDF, 45.11 MB) AppxI_Preliminary Mine Closure Plan_Part5.pdf (PDF, 19.73 MB) AppxJ_Surface Water Assessments.pdf (PDF, 24.15 MB) AppxK_H3 Hydrological Report.pdf (PDF, 22.75 MB) AppxL_Soil Characterisation Report.pdf (PDF, 20.73 MB) AppxM_Waste Rock Characterisation Report.pdf (PDF, 19.63 MB) AppxN_Offset Strategy.pdf (PDF, 11.87 MB) Date Published (Environmental Review documentation) November 13, 2024 Proponent response to submissions Response to Submissions 1 December 2025.pdf (PDF, 651.47 KB) Revised Referral Supporting Document (RSD) Revision 9, December 2025.pdf (PDF, 10.27 MB) Proposal Content Document_ 2025-12-05.pdf (PDF, 1.69 MB) Appendix A - Stakeholder Consultation Register.pdf (PDF, 375.92 KB) Appendix D - Havieron Infrastructure Corridor Reconnaissance Flora and Vegetation Survey, 2020.pdf (PDF, 4.6 MB) Appendix H - Havieron Project Goodenia hartiana Targeted Flora Survey, 2024.pdf (PDF, 4.76 MB) Appendix I - Goodenia hartiana map series.pdf (PDF, 8.57 MB) Appendix K - Part 1 - Telfer Project Ecological Survey, 2002.pdf (PDF, 95.86 MB) Appendix K - Part 2 - Telfer Project Power Supply and Infrastructure Corridor Rare and Priority Fauna and Flora Survey, 2003.pdf (PDF, 20.74 MB) Appendix K - Part 3 - Vegetation Survey and Rare Flora and Fauna Search, Nifty Copper Operations, 2006.pdf (PDF, 5.58 MB) Appendix K - Part 4 - Telfer Borefield Flora and Fauna Survey, 2007.pdf (PDF, 18.34 MB) Appendix K - Part 5 - Telfer Goodenia hartiana Survey, 2010.pdf (PDF, 7.01 MB) Appendix K - Part 6 - Telfer Optimisation Study Area Level 2 Flora and Fauna Survey, 2013.pdf (PDF, 55.88 MB) Appendix K - Part 7 - Telfer O'Callaghan's Study Area Level 2 Flora and Fauna Survey, 2013.pdf (PDF, 64.55 MB) Appendix Q - Havieron Project - Greater Bilby Monitoring 2022.pdf (PDF, 4.99 MB) Appendix U - Havieron Project Social Studies - social risk assessment, 2021.pdf (PDF, 16.18 MB) Date published (Proponent response to submissions) January 05, 2026 Change to proposal during assessment under s. 43A s. 43A notice S. 43A Notice - 251125.pdf (PDF, 2.9 MB) Date of approval s. 43A Tue, 11/25/2025 - 12:00 4. EPA Report on assessment EPA Report Number 1806 EPA Report EPA Report 1806 Telfer-Havieron Gold Mining Project.pdf (PDF, 3.72 MB) Key Environmental Factors Flora and Vegetation Inland Waters Social Surroundings Greenhouse Gas Emissions Subterranean Fauna Terrestrial Fauna Date published Wednesday, April 8, 2026 - 12:00 Appeals close Wednesday, April 29, 2026 - 12:00 5. Decision on proposal and implementation of proposal Ministerial Statement Date of approval Monday, May 25, 2026 - 12:00 Ministerial Statement Statement 1273.pdf (PDF, 1.77 MB)